North Dakota State Guide
A buyer's overview of SPCC, fire code, and permitting considerations for aboveground fuel tanks in North Dakota — before you specify a system.
The federal SPCC rule (40 CFR Part 112) applies to non-transportation-related facilities storing oil aboveground above regulatory thresholds. As a general rule, a facility with more than 1,320 gallons of aggregate aboveground oil storage capacity — counting every container 55 gallons or larger — falls within SPCC's scope. Facilities that trigger SPCC must develop a written Spill Prevention, Control, and Countermeasure Plan, meet secondary containment requirements, and in many cases certify the plan through a licensed Professional Engineer.
In North Dakota's Bakken region, this frequently means specifying a manifolded multi-tank system rather than a single tank from the outset, since aggregate SPCC capacity crosses thresholds quickly at oilfield-support volumes.
North Dakota adopts the International Fire Code (2015 Edition) through Administrative Rule, which references NFPA 30 and 30A, codified in North Dakota Administrative Code Chapter 10-07. For permanent, non-portable aboveground fuel storage tanks used for bulk transfer, bulk plant operations, or dispensing/fueling, a pre-installation application and plans must be submitted directly to the State Fire Marshal's Office for review before installation.
There's a size-based distinction worth knowing: residential or commercial tanks under 660 gallons still must comply with IFC/NFPA 30/30A, but the State Fire Marshal's Office won't formally review plans for them — it's the installer's responsibility to notify the local fire department instead. For commercial tanks over 660 gallons, review time is billed to the North Dakota Petroleum Release Fund. And if your project site sits in a jurisdiction where the State Fire Marshal has delegated review authority to the local AHJ, you'll work with that local authority directly rather than the state office.
North Dakota maintains a Petroleum Tank Release Compensation Fund that farm and ranch owners often ask about — worth clarifying for buyers, since it's easy to conflate with AST permitting. Registration and the associated $50/tank annual fee apply to underground tanks greater than 1,100 gallons; farm and ranch aboveground tanks are generally excluded from that Fund and registration requirement. Don't let a buyer's familiarity with the UST registration process create the assumption that their new AST needs the same registration — it typically doesn't.
Submitting a plan review request to the State Fire Marshal for a sub-660-gallon tank the office won't formally review — confirm the local fire department's requirements instead for smaller installations.
Assuming an AST needs Petroleum Release Fund registration the way a farm UST would — most aboveground tanks are excluded from that requirement.
Underestimating aggregate SPCC capacity on Bakken-region multi-tank systems, where oilfield-support volume crosses the 1,320-gallon threshold faster than expected.
Confirm applicability — determine SPCC thresholds and whether your tank size/use requires State Fire Marshal plan review or local notification only.
Site & tank design review — siting, setbacks, secondary containment, and UL 142 double-wall construction, sized for potential multi-tank systems.
Permit submission — pre-installation application to the State Fire Marshal's Office (or delegated local AHJ where applicable).
Inspection & commissioning — final inspection, tank commissioning, and SPCC plan certification if applicable.
Requirements vary by tank size, use, and delegated jurisdiction. Confirm current requirements with the North Dakota State Fire Marshal's Office.
Quick Facts — North Dakota
Fire Code
2015 IFC via State Fire Marshal (NDAC Ch. 10-07, NFPA 30/30A)
SPCC Trigger
Federal threshold (40 CFR 112)
Plan Review Threshold
Formal SFM review required above 660 gal (bulk/dispensing)
Notable
Bakken oil field demand drives multi-tank systems; ASTs generally excluded from Petroleum Release Fund registration
Regional Demand Drivers
Oil & gas, agriculture
Get sizing options and compliance guidance specific to your site below.
Request a Quote
We'll follow up with sizing options, lead times, and compliance guidance for your site.
FAQ
High-volume operations in the Bakken often require multi-tank, manifolded systems from the outset rather than scaling up later.
No — formal plan review applies to permanent, non-portable tanks used for bulk transfer, bulk plant, or dispensing operations, generally over 660 gallons. Smaller tanks still must meet IFC/NFPA 30/30A but are handled through the local fire department instead.
Generally no. That Fund's registration and $50 annual fee apply mainly to underground tanks over 1,100 gallons; aboveground tanks are typically excluded.
For commercial tanks over 660 gallons, review time is billed to the North Dakota Petroleum Release Fund rather than charged as a direct applicant fee.